From: route@monster.com
Sent: Thursday, January 28, 2016 5:17 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: OSP Engineer
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Tim Anderson 36
Lakewood Manor, Effingham, Illinois 62401 Cell
Phone (770) 820-9652 Objective
To acquire a stable
position in the telecommunications industry which will provide opportunities
for personal growth and advancement commensurate with performance Summary of Qualifications In-depth experience
in engineering and drafting of projects; knowledge of multi-purpose
standards, cost controls, safety controls and violations; ability to
efficiently utilize and manage equipment; experience with consistent
management of same; knowledgeable in the requirements for engineering of the
following using fiber optic cable: FTTH & FTTP, long haul routes and
sonet rings; experience in permitting of D.O.T. and Railroad R.O.W. and
permitting for metropolitan areas Employment History
8/08 to Current Date
Contract
engineer for Kentucky Data Link (KDL) & Cinergy MetroNet (CMN) which
engineers FTTH & FTTP projects for various cities & counties in
Indiana, providing internet, phone & data to subscribers 10/05 to 8/08 OSP Engineering ManagerQ Services / Kentucky Data Link 2701 Communications Way,
Evansville, In. 47715 (812) 253-7000, ext. 7100 Managed and oversaw
the daily operations of the in-house OSP engineering group, for KDL &
CMN. I was responsible for providing accurate daily & weekly production
reports to upper management. Also, I provided an engineering schedule, which
was updated daily & weekly. Worked in conjunction with all Project
Managers to resolve any and all issues, which included current or previously
engineered routes i.e. permitting, revisions, makeready, etc. Pre-ride
proposed routes, to resolve any and all questions prior to OSP engineers
arriving on routes to be engineered. Managed and oversaw
the CMN (Cinergy MetroNet) OSP engineers, daily strand mapping of the city
builds, which were FTTH / FTTP projects that encompassed every residential
and commercial address within the city limits and other revenue-generating
areas within the county. QC’D all work completed by the OSP engineers prior
to submitting it to the CAD Department. Worked in conjunction with
in-house permit agents to resolve various questions regarding permits on all
proposed routes. 4/01 to 9/05 OSP Engineering ManagerCics & Down Under
Construction, Inc. 6450 Industrial Way, Suite
A, Alpharetta, Ga. 30004 (770) 772-6694 Managed and oversaw
the verification of as-builts and required permitting of numerous fiber optic
cable routes for FPL Fibernet, within the state of Florida. Managed and
oversaw the verification of as-builts of an AT&T route from Atlanta,
Georgia to Orlando, Florida.. 1/99 to 4/01 OSP Engineering ManagerOSP Consultants, Inc. 21400 Ridgeton Circle,
Suite 101, Sterling, Va. 20166 (703) 421-2450 Managed and oversaw
the OSP engineering and permitting of numerous fiber optic cable routes
within Norfolk Southern (T-Cubed) R.O.W. in the following areas: Atlanta
metro, Atlanta, Ga. to Jacksonville, Fl.; Manassas, Va. to Boyce, Va. and
Boyce, Va. to Riverton Junction, Va.; Blacksburg, SC. to Atlanta, Ga. and
Chattanooga, Tn. to Memphis, Tn. Managed and oversaw
the OSP engineering and permitting of a fiber optic cable route from Memphis,
Tn. to Nashville, Tn., which included a sonet ring within the Memphis city
limits. All permitting was submitted to T.D.O.T. and to the City of Memphis
for approval. Managed and oversaw
the OSP engineering and permitting of five separate sonet rings within the
Atlanta, Ga. city limits, for Metromedia Fiber Network (MFN). Areas of
the above mentioned were engineered to accommodate AT&T / MFN for a joint
build venture. 9/97 to 1/99Lead EngineerQWEST Communications 555 Seventeenth Street,
Denver, Co. 80202 (303) 291-1400 Managed and oversaw
the accuracy of as-builts and redlined prints of the fiber optic cable route
from Atlanta, Ga. to Charlotte, NC.. Supervised approximately 30 construction
inspectors, who submitted documentation (redlines) reporting daily progress
of the project. Supervised the engineering of the fiber optic cable
route from New Orleans, La. to Pensacola, Fl. and a joint build venture
project between QWEST and Gulf Telephone from Mobile, Al. to Jacksonville,
Fl.. Knowledgeable in the operation of the following equipment: rail plow,
directional bore machines (large and small), trencher, backhoe and cat plow. 5/97 to 9/97OSP Engineering ManagerOSP Consultants, Inc. 21400 Ridgeton Circle,
Suite 101, Sterling, Va. 20166 (703) 421-2450 Supervised
engineering of a long haul fiber optic cable project from Amite, La. to
Lucedale, Ms. paralleling SR 26. Responsible for providing and
acquiring correct road base for the CAD Department and obtaining
documentation on the proposed bridges and hurricane evacuation routes being
constructed by M.D.O.T. 5/90 to 5/97OSP Engineering ManagerMetronet, Inc. 4040 Nine McFarland Road,
Alpharetta, Ga. Worked on various
projects all over the United States, doing CATV as-builts and fiber optic
cable rings and transport routes. Clients involved: TCI,
Scripps-Howard, MCI, MFS and KMC. 4/78 to 5/90Project ManagerT.E.I. (Telephone Engineering Inc.) P.O. Box 1207, Roswell, Ga.
30077 Worked on premise
for 12+ years for MST & T / US West , responsible for CATV make-ready
walkouts with various power companies and CATV companies. Responsible for
identifying all separations, on existing outside plant, to verify if outside
plant was in compliance with NESC. Determined which utilities required
Make-Ready, and identified what re-arrangements were required by each
utility. Ordered and distributed any and all construction materials necessary
to perform required makeready functions to construction sub-contractors.
Approved required CIP’S with construction supervisor and signed off on all
Change Orders. |
|
|
|||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
|
|